Headings.
IC O
Isenud
ee alid oe
South Side.
North Side....
Mer
ME DATA
193
Total.
2,885 feet
Progress.
185 feet.
3,395
#
104 #
Total
6,280 feet
289 feet
Lining.
Total.
Progress.
South Side.
1,680 feet
90 feet
North Side..
1,275
2,955 feet
#
nil
90 feet
one#
I wh oroDE
Widened out at North Side but not vet lined.
Lien cont
vitaang
32 2 J
C. NO
M
CALL 7 B.
don chie to
11.
Total
855 feet
Progress
75 feet
Tunnel No 3 has about twenty feet remaining to be
done and both portals are practically completed.
12.
13.
Tunnel No 4 complete except south portal.
Tunnel No 5 has made good progress. The heading driving from North Side was alowed down in order to have the junction with heading from South Side more central and so
divide up the tunnel into more even sections for widening out.
The progress is as follows:-
Headings
I
Total
South Side.
North Side..
Total.
275 feet
629 #
804 feet
Progress
46 feet
52 11
98 feet
LINING.
South Side.
North Side...
Total..
-17-
Total
778 feet
200 11
278 feet
Progress
11 feet
52 ##
63 feet
14.
Was